project brief
This project involved the relocation of a specialist tool room as part of a wider site reorganisation programme. The scope of works included the safe movement of production machinery, the installation of new electrical infrastructure to support the relocated equipment, and the precision levelling and commissioning of each machine at its new location. The project required a carefully coordinated approach to ensure equipment was relocated efficiently and returned to full operational capability with minimal disruption.
category
client
Louvolite
start date
2018
end date
2018


innovative process
The challenge
Relocating production machinery from an operational tool room presents a number of technical and logistical challenges. Each machine needed to be moved safely and accurately, taking into account weight, access constraints, and sensitivity of precision components. Detailed planning was required to coordinate lifting, In addition to the physical relocation, the new tool room location required upgraded electrical infrastructure to support the machinery. Power supplies had to be installed and configured to suit the specific requirements of each machine, ensuring compliance with relevant standards. Once installed, each machine required precise levelling and commissioning to ensure accuracy, reliability, and optimal performance within the new workspace.
project goals
The primary goal of the project was to deliver a seamless relocation of the tool room, ensuring machinery was safely transferred, correctly powered, and fully operational at the new site. Accuracy, safety, and efficiency were key priorities throughout the project.
the result
The project was completed successfully, with all machinery relocated, installed, and commissioned to specification. The new electrical infrastructure provides reliable power distribution tailored to the needs of the tool room, while precision levelling ensured each machine was restored to full operational accuracy. The client was left with a fully functional tool room, delivered with minimal downtime and ready to support ongoing production requirements in its new location.