project brief

This project involved the electrical installation works required to support the development of a new cardboard carton manufacturing cell within an active production facility. The scope focused on delivering reliable, high-capacity power distribution and effective lighting to support specialist manufacturing equipment and associated processes. All works were carried out with consideration for operational continuity, safety, and future flexibility within the production area.

client

Smufit Kappa

start date

2023

end date

2024

innovative process

The challenge

Installing new electrical infrastructure within a live manufacturing environment presents a number of challenges, particularly where high-load equipment and tight production schedules are involved. The new manufacturing cell required a dedicated panel board capable of supporting significant electrical demand, while ensuring compatibility with the site’s existing power distribution network. In addition, the manufacturing process demanded flexible auxiliary power supplies to support a range of equipment configurations and future changes. Lighting was also a key consideration, with the production area requiring consistent, high-level illumination to support safe and efficient working practices. The challenge was to deliver a solution that balanced performance, compliance, and long-term adaptability.

project goals

The overall goal of the project was to provide a robust and scalable electrical installation that supported the efficient operation of the new manufacturing cell. This included ensuring sufficient capacity for high-load equipment, flexibility for auxiliary supplies, and improved visibility and safety through modern lighting solutions.

  • Installation of a 630A panel board to provide reliable power distribution

  • Installation of auxiliary power supplies up to 200A to support manufacturing equipment

  • Installation of LED high-bay lighting throughout the production area

the result

The project was delivered successfully, providing the client with a dependable electrical infrastructure tailored to the needs of the new manufacturing cell. The 630A panel board delivers sufficient capacity and resilience, while the auxiliary power supplies allow for flexible equipment layout and future expansion. The LED high-bay lighting has enhanced visibility across the production area, improving safety and productivity. The completed installation supports efficient manufacturing operations and provides a solid foundation for ongoing growth and development.