project brief

This project involved the modernisation of an existing teaching block to support updated learning requirements and improved classroom functionality. The works focused on upgrading data connectivity, reconfiguring electrical power supplies to suit a new classroom layout, and replacing outdated lighting with modern LED solutions. The objective was to create a more flexible, efficient, and future-ready teaching environment while maintaining a safe and comfortable space for staff and students.

client

Lady Barn House School

start date

2018

end date

2018

innovative process

The challenge

Modernising an occupied education facility presents a number of logistical and technical challenges. The works needed to be carried out with minimal disruption to teaching activities, requiring careful planning, phased installation, and close coordination with site management. Existing electrical infrastructure had to be assessed In addition, the project required upgrades that balanced performance, energy efficiency, and longevity. Network points needed to be positioned to support modern teaching methods, including interactive displays and student devices, while power supplies had to be reconfigured safely to suit new furniture and equipment arrangements. The lighting replacement also needed to improve illumination levels while reducing energy consumption and maintenance requirements.

project goals

The goal of the project was to deliver a modern, flexible teaching environment that supports contemporary learning and technology use. This included improving connectivity, ensuring power supplies were correctly configured for the new classroom layouts, and enhancing the learning environment through efficient lighting upgrades.

  • Installation of network points to support digital learning and connectivity

  • Reconfiguration of power supplies to suit the new classroom layout

  • Replacement of existing lighting with new LED lighting

the result

The project was completed successfully, delivering a refreshed teaching block that meets the demands of modern education. Improved network connectivity supports a wide range of digital teaching tools, while reconfigured power supplies provide safe and flexible access to electrical outlets throughout each classroom. The new LED lighting has significantly improved light quality and energy efficiency, creating a brighter, more comfortable learning environment. The upgraded teaching spaces now offer enhanced functionality, reduced running costs, and a future-proofed infrastructure ready to support evolving educational needs.

recent Case studies